it takes 20 people 24 days to build a barn. in how many days will the barn be built if they had 32 people working

Respuesta :

bluevortexwitepower bluevortexwitepower
  • 02-02-2019

Answer:

15 days

Step-by-step explanation:

Number of ppl it takes to build a barn in 24 days=20

Time it will take 32 people to build the barn=24*20/32=15 days

Answer Link

Otras preguntas

Beth needs to add a 10% tip to her $12 meal. How much money does she need to add?
Which shows the expression below in simplified form? (6.7 × 10-4) - (3.1 × 10-7)
What message did the Boston tea party send to the British government
How many times does 3/4 go into 4 1/2?
Why do you think the West Coast was settled before the interior of the United States?
a pizza parlor has 8 different toppings and 3 different cheeses to choose from on the menu. How many pizza combinations are possible if each pizza has 1 topping
Name the different levels on organization within the biosphere, from smallest to largest
Which of the following are the jovian planets? Jupiter, Saturn, Uranus, and Neptune only only Jupiter and Saturn everything past Mars and the asteroid bel
Which event in China is symbolized by the lady with the light in this 1989 cartoon?
Which molecule has a structure with a ratio of 2 hydrogen 1 oxygen