​Finishing the construction of a home two days after the contract called for completion (no injury occurs) most likely will be considered

Respuesta :

andriansp andriansp
  • 08-06-2016
Finishing the construction for a longer period than the date that already agreed upon would be most likely considered : Breach of Contracts.
Which mean that the constructor basically fail to met his end of the contract agreement, causing the other party has the right to walk out from their contract
Answer Link

Otras preguntas

Mention Five blessing of god and appreciate them​
Part A: The low tempratures for a week in january in Billings, MT are listed below. Monday- -4.50 Tuesday- -6.00 Wenesday- -9.50 Thursday- -3.25 Friday- -0.75 S
Need answer please and this a part 1 to this math hw spam
what was the significance of the battle of Poitiers in France in 732 CE
Why did inflation occur after World War I
Part A: The low tempratures for a week in january in Billings, MT are listed below. Monday- -4.50 Tuesday- -6.00 Wenesday- -9.50 Thursday- -3.25 Friday- -0.75 S
twice a number increased by 6
Evaluate j/k -0.2k when j=25 and k=5
A stationery store sold 320 of two different types of pens for $190.55. One type of pen costs 25 cents and the other costs 80 cents. How many 80 cent pens were
Aubrey brought 2 1/2 pans of lasagna to a family dinner. During the meal, Aubrey and her family ate 75% of the lasagna. At the end of the dinner, Aubrey's broth