IUlawyer8169 IUlawyer8169
  • 01-01-2021
  • Business
contestada

When multiple teams work together on the same product each team should:_____.

Respuesta :

Parrain
Parrain Parrain
  • 03-01-2021

Answer: B. False

Explanation:

A product backlog is the list that records the improvements to be made to a product.

Teams operating separately should not have multiple backlogs but should have one so that when the team mean to develop the product looks at the backlog, there is one single authoritative file instead of multiple ones that could complicate things.

Answer Link

Otras preguntas

Lines y and z are parallel. what is the measure of angle 2? A. 6 B. 11 C. 28 D. 37
Geometry math question no Guessing and Please show work thank you
What was the primary goal of american foreign policy in the 21st century?
Rima complete the rhyme with the appropriate forms of the correct verbs from the list. contar oír poder suponer "si no dormir y el sueño deseas, lo vas a cons
what is the average rate of change from x=-1 to x=1
atoms of O-16, O-17,O-18 have the same number of neutrons?
A popular species of fish were split by the formation of the isthmus of panama a long time ago. The fish developed changes in their genes to adapt to the new en
What is the volume of a box measuring 2cmX7cmX3cm?
Which causes winds to blow over the surface of earth ? A. Uneven warming by the sun B. Fast flowing rivers C. The water cycle D. Infrared radiation
Jerome is a pharmacy technician that filled a prescription that use 1/4 bottle of ibuprofen. How many pills did jerome use for the prescription if there are 100